BRIDGE | MT GROUP
The BRIDGE method
Six phases, six deliverables, six decision points. Every project has a defined scope, acceptance criteria and a change request procedure.
- B
Business need
Understand which process really weighs, and why.
Needs document with the priority process and success criteria.
- R
Reconnaissance
Map existing data, systems, roles and constraints.
Map of systems, data sources and roles.
- I
Integration
Define how the platform talks to what already exists.
Integration specification and data plan.
- D
Design
Design the experience and validate it with real users.
Validated prototype and release scope.
- G
Go-live
Release, test with users, train.
Platform in service, UAT report, training materials.
- E
Evolution
Measure real usage and grow the platform.
Adoption report and evolution roadmap.
Scope, acceptance and change requests
Every project starts from a written scope, with acceptance criteria verifiable in UAT. Requests outside the scope are handled as change requests, assessed and approved before development.
