Skip to main content
BRIDGE — MT GROUP

BRIDGE | MT GROUP

The BRIDGE method

Six phases, six deliverables, six decision points. Every project has a defined scope, acceptance criteria and a change request procedure.

  1. B

    Business need

    Understand which process really weighs, and why.

    Needs document with the priority process and success criteria.

  2. R

    Reconnaissance

    Map existing data, systems, roles and constraints.

    Map of systems, data sources and roles.

  3. I

    Integration

    Define how the platform talks to what already exists.

    Integration specification and data plan.

  4. D

    Design

    Design the experience and validate it with real users.

    Validated prototype and release scope.

  5. G

    Go-live

    Release, test with users, train.

    Platform in service, UAT report, training materials.

  6. E

    Evolution

    Measure real usage and grow the platform.

    Adoption report and evolution roadmap.

Scope, acceptance and change requests

Every project starts from a written scope, with acceptance criteria verifiable in UAT. Requests outside the scope are handled as change requests, assessed and approved before development.